Q1. How do you safely isolate, discharge, and verify zero voltage before working on a capacitor bank?
Answer: Only authorized electrical personnel may work on capacitor banks under an approved permit, risk assessment and LOTO procedure. Isolate every supply, including control and auxiliary sources, secure the isolation and observe the manufacturer’s discharge waiting time; some LV panels specify five minutes. Stored charge can remain even after this interval. Prove a correctly rated voltage tester on a known source, verify absence of AC and DC voltage at all relevant terminals, then reprove the tester. Follow the manufacturer’s approved discharge and grounding procedure, where applicable, and recheck for voltage recovery. Never use a screwdriver to short terminals.
Practical Interview Tip: A controller displaying zero kVAR does not prove electrical isolation.