Skip to content
Electrical TopicPractical guides. Stronger skills.Learn in Hindi

Transformer Practical Interview Questions – Electrical Testing

15 Transformer Interview Q&A – Practical Part 3

Revise insulation resistance, winding resistance, turns ratio and polarity tests with clear answers and two mock tests.

31

Q31. Why is insulation resistance tested?

Answer: Insulation Resistance (IR) testing checks insulation health between HV–Earth, LV–Earth, and HV–LV using a Megger (typically 500 V/1000 V DC for LT windings and 2500 V/5000 V DC for 11 kV/33 kV HT windings). Alongside 1-minute IR values, the Polarization Index (PI = 10-minute IR / 1-minute IR) is checked—a PI above 1.3–1.5 indicates healthy dry insulation, while below 1.0 signals moisture or contamination.

Read detailed article
32

Q32. What is a winding resistance test?

Answer: A winding resistance test injects a stable DC current (typically 1–10 A, kept below 10–15% of rated current to avoid heating) using a micro-ohmmeter to detect loose terminations, bad tap-changer contacts, or broken strands. Measured resistance across all three phases on the same tap and temperature should normally agree within ±2%.

Read detailed article
33

Q33. What is a transformer turns ratio test?

Answer: A turns ratio test checks whether each winding ratio matches the expected value for the selected tap and connection. Many commissioning specifications use a tolerance around ±0.5% where applicable, but the agreed standard and test configuration govern acceptance. Verify vector compensation and tap position before investigating results that differ from the nameplate or factory data.

Read detailed article
34

Q34. What is a polarity test?

Answer: A polarity test verifies the relative instantaneous voltage direction between HV and LV terminals (subtractive or additive). Practically, one HV and one adjacent LV terminal are shorted, low AC voltage (e.g., 230 V) is applied to HV, and voltage is measured across the other two terminals: if V_measured < V_applied, polarity is subtractive; if V_measured > V_applied, it is additive.

Read detailed article
35

Q35. What is a vector group?

Answer: A vector group defines the HV and LV winding connections and their phase shift in clock-hour notation (each hour = 30°). In Dyn11, HV is Delta, LV is Star with neutral brought out, and LV leads HV by 30°. On site, it is verified by shorting 1U–2U, applying low 3-phase AC voltage to HV, and confirming the standard inter-terminal voltage equations match the nameplate.

Read detailed article
36

Q36. Why is the vector group checked?

Answer: Vector group is checked to prevent incorrect phase relationships during connection, parallel operation and protection setup. A one-hour clock difference represents 30 electrical degrees, and differential relay compensation must match the actual group and CT arrangement. Compare the field test with the approved single-line diagram and relay configuration before permitting energization or bus paralleling.

Read detailed article
37

Q37. What is an excitation current test?

Answer: An excitation (magnetising) current test applies low single-phase AC voltage to each HV phase with the LV side open to detect core lamination shorts, turn-to-turn faults, or tap-changer issues. On a healthy three-limb core transformer, it produces a characteristic "two-high, one-low" pattern—the two outer phases show nearly equal higher current while the centre phase shows lower current.

Read detailed article
38

Q38. What is a tan-delta test?

Answer: A tan-delta (dissipation factor / power factor) test measures dielectric losses in transformer windings and capacitive bushings under AC test voltage to detect moisture, aging, or insulation contamination. Healthy new oil-immersed transformer insulation typically shows tan-delta below 0.5% (at 20°C); values rising above 0.7–1.0% warrant detailed investigation or oil treatment.

Read detailed article
39

Q39. What is an SFRA test?

Answer: SFRA (Sweep Frequency Response Analysis, per IEC 60076-18) injects a low-voltage variable-frequency signal (typically 20 Hz to 2 MHz) into windings to capture their mechanical/electrical fingerprint. Comparing the trace against a factory baseline—especially after transportation or a heavy through-fault—detects winding deformation, axial shift, or core movement without opening the tank.

Read detailed article
40

Q40. Why is a short-circuit impedance test useful?

Answer: Short-circuit impedance testing checks the relationship between applied voltage and current when the opposite winding is shorted under controlled test conditions. A transformer marked 5% impedance has that relative impedance on its rated base at the specified reference condition. Compare approved measurements with factory values if mechanical movement or unusual fault duty is suspected.

Read detailed article
41

Q41. Why must a transformer be isolated before electrical tests?

Answer: Full isolation prevents electrocution from live supply or backfeed (from DG, UPS, or parallel transformers) and stops connected cables/relays from distorting test readings. Always follow PTW and LOTO procedures: open and rack out both HV and LV breakers, disconnect HV/LV cables or busbars, verify zero voltage with a tested detector, and apply temporary earths before testing.

Read detailed article
42

Q42. What is the purpose of discharging a winding after a test?

Answer: During DC insulation (Megger) or winding resistance tests, transformer windings store hazardous capacitive and inductive energy. Always discharge each tested winding safely to earth through a discharge rod/resistor for at least 4 times the test duration (e.g., 4+ minutes after a 1-minute IR test) before touching terminals or disconnecting leads.

Read detailed article
43

Q43. Why do we record test temperature?

Answer: Both insulation resistance and winding resistance vary strongly with temperature—IR value roughly halves for every 10°C rise in temperature, while copper/aluminium winding resistance increases with temperature. Recording oil/winding temperature allows readings to be normalized to a standard reference (typically 20°C for IR and 75°C for winding resistance per IS 2026 / IEC 60076) for accurate trending.

Read detailed article
44

Q44. Can one test result alone prove a transformer is healthy?

Answer: One result cannot prove overall transformer health because each diagnostic test examines a different failure mechanism. TTR checks ratio, winding resistance checks the DC path, and SFRA under IEC 60076-18 helps compare mechanical signatures, while oil tests provide separate evidence. Assess the results with loading, fault history and physical inspection before deciding what further checks are needed.

Read detailed article
45

Q45. What should a test report include?

Answer: A transformer test report documents the equipment, methods, readings and acceptance decision so another engineer can review the work. Include serial number, tap, test voltage or current, temperature, instrument references and applicable IS 2026 or IEC 60076 criteria. Attach phase results and deviations and obtain authorised sign-off before using the report for release to service.

Read detailed article

Test Your Knowledge Through Mock Test

Practical Part 3 · Two tests, 10 questions each. Choose a test below to begin.

Question 1 of 100 / 10 answered

Your answers stay on this page.

KEEP LEARNING WITH ELECTRICAL TOPIC

Learn Faster. Improve Your Electrical Skills.

WEBSITE • EMAIL UPDATES

New guides. Straight to your inbox.

Subscribe free. Get fresh website updates.

Have a question? Email info@electricaltopic.com

Videos in Hindi

Electrical Topic on YouTube

Watch practical electrical lessons from our YouTube channel.

Visit channel