AC Motor Starter Practical & Maintenance Interview Questions – DOL Inspection, Contactor & OLR Testing

10 AC Motor Starter Interview Q&A – Practical & Maintenance Part 1

Read short, practical answers. Then try two mock tests.

Jump to Question:
01

Q1. What do you inspect during daily, weekly and monthly maintenance of a DOL starter?

Answer: Routine DOL starter maintenance covers indications, abnormal noise, heating and recurring trips, with internal checks performed during planned isolation. Record phase current in amperes, enclosure temperature in degrees Celsius and relay trip indications under comparable load. Set weekly and monthly tasks from the site maintenance plan, and escalate a worsening trend early.

Read detailed article
02

Q2. How do you inspect contactor contacts for pitting, burning or welding?

Answer: Contactor contacts should be inspected for uneven wear, severe pitting, overheating and welded poles according to the manufacturer's service instructions. The replacement contact kit must match the contactor's rated operational current and AC-3 motor duty where applicable. During authorised isolation, also check the moving assembly for sticking and inspect the cause of overheating.

Read detailed article
03

Q3. How do you check a contactor coil's rated supply voltage and electrical condition?

Answer: Check the contactor coil rating and condition against its diagram before assuming the coil has failed. Coil terminals are commonly marked A1 and A2, and typical supplies include 24 V DC, 110 V AC or 230 V AC, with ratings model-specific. Have authorised staff verify supply and compare isolated readings with manufacturer guidance.

Read detailed article
04

Q4. How do you test START/STOP push buttons, auxiliary contacts and the holding circuit?

Answer: Verify that START closes, STOP opens and the holding contact maintains the coil circuit after START is released. Common markings are 13–14 for a NO auxiliary and 95–96 for the NC overload contact, subject to the device drawing. Use isolated continuity checks and confirm normal drop-out during an approved functional test.

Read detailed article
05

Q5. How do you select and set an overload relay using motor nameplate current and its circuit position?

Answer: Select an overload relay that covers the required motor current and set it according to where it senses current. A line-mounted relay typically uses 100% of nameplate full-load line current, while a relay inside delta typically sees about 58% of line current. Check the actual power diagram and manufacturer's setting instructions before applying the value.

Read detailed article
06

Q6. How do you test overload relay tripping, reset and trip-class selection?

Answer: Verify overload operation, permitted reset and control circuit drop-out using the manufacturer's test method. IEC trip classes such as 10 and 20 describe time bands at specified test conditions, while the built-in test button does not prove the thermal curve. Compare the selected class with approved acceleration data and record the result.

Read detailed article
07

Q7. How do you test a phase failure relay and verify the three-phase supply?

Answer: Check that the phase monitor sees a healthy supply and removes its permissive when the approved test method simulates a fault. On a nominal 415 V system, compare L1–L2, L2–L3 and L3–L1 and confirm the relay's programmed limits and delay. Record indication and output response without disconnecting a live phase to test it.

Read detailed article
08

Q8. How do you measure and record starter input/output voltage and motor running current?

Answer: Record the starter supply and motor-side voltage under a stable running condition, together with the current in each phase. For a nominal 415 V system, record all three line-to-line readings and compare phase amperes with the motor nameplate. Use authorised measurement points and check one abnormal pole for voltage drop through its connection.

Read detailed article
09

Q9. How do you inspect loose terminals and hot connections using visual checks and thermography?

Answer: Loose or damaged connections can show discolouration or abnormal heat compared with equivalent terminals under similar load. Thermography should record phase current and temperature difference, while isolated terminal tightening must follow the manufacturer's torque in N·m. Inspect the lug, conductor and contact surfaces before deciding whether tightening alone is adequate.

Read detailed article
10

Q10. How do you inspect control fuses, cable glands, earthing and cable terminations in a starter panel?

Answer: Inspect control fuses, glands, bonding and cable terminations for the correct ratings and signs of physical damage. Fuse current and voltage ratings must match the design, and glands, seals and blanks must maintain the enclosure's specified IP rating. During approved isolation, check earth continuity and verify replacement components against the panel schedule.

Read detailed article

Test Your Knowledge Through Mock Test

Starter Practical – Part 1 · Two tests, 10 questions each. Choose a test below to begin.

Question 1 of 100 / 10 answered

Your answers stay on this page.

KEEP LEARNING WITH ELECTRICAL TOPIC

Learn Faster. Improve Your Electrical Skills.

WEBSITE • EMAIL UPDATES

New guides. Straight to your inbox.

Subscribe free. Get fresh website updates.

Have a question? Email info@electricaltopic.com

Videos in Hindi

Electrical Topic on YouTube

Watch practical electrical lessons from our YouTube channel.

Visit channel