Transformer Practical Interview Questions – Maintenance and Inspection

15 Transformer Interview Q&A – Practical Part 1

Revise daily transformer checks, loading, readings and logbook entries before trying the two mock tests.

Jump to Question:
01

Q1. What should be recorded in a transformer logbook?

Answer: A transformer logbook records operating conditions, alarms and work completed against the correct asset number. Typical shift entries include HV and LV voltage, phase current, tap position, top-oil and winding temperatures in degrees Celsius, and cooling status. Record load and ambient conditions with the time so later shifts can compare like operating conditions.

Read detailed article
02

Q2. Why do we check transformer readings every shift?

Answer: Shift readings help detect changes in loading, cooling and insulation-related indicators before an alarm develops. For example, compare the top-oil temperature rise above ambient at similar kVA loading and cooling stage, rather than comparing temperature alone. Flag repeated increases or gauge discrepancies and hand them over with the operating conditions and asset identification.

Read detailed article
03

Q3. What is a daily visual check of a transformer?

Answer: A daily visual inspection covers oil level in the MOG, silica-gel colour and breather oil-cup level, oil leaks around gaskets/valves/radiators, bushing cracks or flashover marks, Buchholz relay inspection glass for gas, OTI/WTI readings, cooling fan operation, and any abnormal humming or crackling noise.

Read detailed article
04

Q4. How do we check transformer loading?

Answer: Transformer loading is checked from phase currents and voltage or from reliable metered kVA and compared with the applicable rating. For a balanced three-phase load, kVA = √3VLIL/1000, and an ONAN or ONAF stage may have a different rating. Check the highest phase current, cooling availability and duty before accepting continued loading.

Read detailed article
05

Q5. Why do we inspect the oil level?

Answer: Oil level is checked on the Magnetic Oil Gauge (MOG) against ambient/oil temperature to ensure windings and core remain fully immersed. If oil drops too low, cooling circulation stops, insulation weakens, and the Buchholz relay will trigger an alarm or trip. Always check for leaks before topping up with tested oil.

Read detailed article
06

Q6. What should we do if oil leaks from a transformer?

Answer: First clean the oily area to trace the exact leak source (bushing gasket, radiator valve, or tank weld), place a drip tray for containment, and monitor the MOG level closely. Minor flange leaks can be arrested by tightening bolts or replacing gaskets during a planned shutdown; severe leaks require immediate isolation to prevent low-oil tripping.

Read detailed article
07

Q7. What do we check on transformer bushings?

Answer: Check transformer bushings for cracks, contamination, tracking, leakage and unusual heating without approaching energized parts. The bushing must match the specified voltage and current ratings under IEC 60137 where applicable, and thermography is compared at similar load. Report abnormal readings and arrange an authorised isolated inspection before deciding whether replacement is needed.

Read detailed article
08

Q8. Why is earthing checked during maintenance?

Answer: Transformer earthing provides a safe low-resistance path for fault currents and stabilizes the neutral voltage. As per IS 3043, a transformer requires two separate body earthings and two separate neutral earthings (for Star secondary), with earth pit resistance typically maintained below 1–2 Ω. Check for loose bolts, rust, and strip continuity during PPM.

Read detailed article
09

Q9. How do we inspect a silica-gel breather?

Answer: Check the silica-gel colour (blue = dry, pink = moisture-saturated; or orange to green for eco-gel) and replace or reactivate the gel once about two-thirds turns pink. Also verify that the glass housing is intact, air vents are clear, and the bottom oil-seal cup is filled to the mark with clean transformer oil.

Read detailed article
10

Q10. What is checked before energizing a transformer?

Answer: Before energizing, verify all pre-commissioning test records: IR (Megger) test, oil BDV test, turns ratio, winding resistance, and earth resistance. Physically confirm oil level, breather condition, tap position, Buchholz/OTI/WTI alarm and trip circuits, removal of temporary earths/tools, and formal PTW clearance.

Read detailed article
11

Q11. What is a preventive maintenance checklist?

Answer: A preventive maintenance checklist sets out inspection tasks, intervals, acceptance criteria and responsibility for each transformer. Use the maker’s schedule and applicable IS 2026 or IEC 60076 documentation for the equipment data, while site rules govern work methods. Enter measured values and follow-up actions as well as the completion status for each item.

Read detailed article
12

Q12. Why do we compare present readings with old readings?

Answer: Comparing present and previous readings shows whether a value is stable or moving toward an abnormal condition. Temperature, load, tap and test method can change readings in units such as micro-ohms, megohms or degrees Celsius, so compare equivalent conditions. Check instrument accuracy and measurement context before attributing a single change to equipment deterioration.

Read detailed article
13

Q13. How is transformer maintenance frequency decided?

Answer: Maintenance frequency depends on transformer design, environment, criticality and actual operating condition. Use the maker’s calendar or operation-count schedule, then review trends such as oil test results, cooling performance and OLTC duty. Increase attention through the approved maintenance programme if a developing defect or severe duty makes the normal interval unsuitable for the installation.

Read detailed article
14

Q14. What belongs in a maintenance report?

Answer: A maintenance report records what was inspected, what was found and what must happen before the equipment is released. Include asset identification, test method, instrument reference, numerical readings and limits, then list defects and as-left settings. Assign an owner and due date for open actions and obtain the required return-to-service approval before closing the work order.

Read detailed article
15

Q15. What should we do with an unusual transformer noise?

Answer: Compare the sound against the normal steady 100 Hz core hum (on a 50 Hz supply). Rattling or metallic vibration usually indicates loose core clamps, radiator fins, or cooling fan mounts, whereas crackling, hissing, or popping can indicate internal arcing or partial discharge—which requires immediate reporting, load/temperature logging, and urgent DGA/electrical investigation.

Read detailed article

Test Your Knowledge Through Mock Test

Practical Part 1 · Two tests, 10 questions each. Choose a test below to begin.

Question 1 of 100 / 10 answered

Your answers stay on this page.

KEEP LEARNING WITH ELECTRICAL TOPIC

Learn Faster. Improve Your Electrical Skills.

WEBSITE • EMAIL UPDATES

New guides. Straight to your inbox.

Subscribe free. Get fresh website updates.

Have a question? Email info@electricaltopic.com

Videos in Hindi

Electrical Topic on YouTube

Watch practical electrical lessons from our YouTube channel.

Visit channel