HT Panel PPM Maintenance
Procedure and checkpoints of maintenance activity.
1 -HT panel PPM Maintenance :

2 -HT Panel maintenance checklist template.:

3 -HT Panel PPM Maintenance annualy schedule:
In one year maintenance activity is carried out many times according time schedule so it is called maintenance frequency which is below mentioned.
- Monthly PPM
- Quarterly PPM
- Half yearly PPM
- Yearly PPM
4 -HT panel PPM maintenance activity procedure:
PPM working procedure is carried out according time schedule. The procedure of PPM is going to explain according time schedule as per below mentioned.
1 - Monthly Preventive maintenance:
When once im a month the PM activity is carried out then it is called as monthly PM activity. A maintenance checkpoint list is followed during maintenance activity which is given below mentioned.
- Clean the panel with air blower and clothes.
- Check all busbar connection input and output.
- Check all circuit breaker input and output connections.
- Check any abnormal sound in panel.
- Check earthing connection with panel.
- Check all measuring instruments meters.
- Check all circuit breaker functions
- Check indicators, selector switches
- Check all parameters on load.
2 - Quarterly Preventive Maintenance:
When once im a three months, the PM activity is carried out then it is called as Quarterly PM activity. A maintenance checkpoint list is followed during maintenance activity which is given below mentioned.
- First of all repeat monthly PM checkpoints.
- Check any hot spot in panel.
- Check all circuit breaker load according capacity.
- Check thimble terminal temp.
- Check earthing value with panel it should be less than 2 ohm.
- Check panel accessories and accessories connection.
3 - Half Yearly Preventive Maintenance:
When once im a six months, the PM activity is carried out then it is called as half yearly PM activity. A maintenance checkpoint list is followed during maintenance activity which is given below mentioned.
- First of all repeat monthly and quarterly PM activity.
4 - Yearly Preventive maintenance:
When once im a year, the PM activity is carried out then it is called as yearly PM activity. A maintenance checkpoint list is followed during maintenance activity which is given below mentioned.
- First of all repeat monthly and quarterly PM activity.
- Check all busbar connection and tight properly.
- Calibrate all measuring instruments like as ammeter and voltmeter etc.
- all circuit breaker maintenance properly.
- All vaccuam or SF6 circuit breaker IR value test according short circuit, earth fault , overload and instantanius fault.
- All protection relay testing according their fault parameter setting.
- HT panel earth resistance value check. It should be as per default value.