Capacitor Bank Sizing & APFC Commissioning – Practical Interview Questions and Answers (Part 1)

Sizing and commissioning an Automatic Power Factor Correction (APFC) panel requires more than selecting a capacitor bank from a catalogue. Electrical maintenance engineers must understand load profiles, reactive power demand, capacitor voltage ratings, feeder protection, current transformer polarity and controller settings. A reliable installation also depends on harmonic measurements, proper discharge arrangements, verified interlocks and coordinated operation with standby generators. This practical interview guide connects design calculations with the checks performed during industrial panel commissioning. It includes worked examples, applicable electrical standards and field-oriented interview tips. Two interactive mock tests help candidates evaluate their understanding of capacitor sizing, switchgear selection, APFC controller configuration and safe commissioning practices.

13 Practical Power Factor Interview Q&A – Sizing and APFC Commissioning

Jump to Question:
01

Q1. How do you calculate the required capacitor bank capacity (kVAR) for a given kW load?

Answer: Use the measured active load P in kW and the initial and target displacement power factors. First calculate φ1 = cos⁻¹(PF1) and φ2 = cos⁻¹(PF2). Then calculate Qc = P × (tan φ1 − tan φ2), in kVAR. For a 200 kW load at 0.80 lagging PF, corrected to 0.98 lagging, tan φ1 = 0.750 and tan φ2 ≈ 0.203. Therefore Qc = 200 × (0.750 − 0.203) ≈ 109.4 kVAR. Select a staged bank around 110 kVAR of effective output, subject to load logging and harmonic assessment. This calculation compensates fundamental reactive power, not distortion power.
Practical Interview Tip: Use simultaneous kW and displacement PF readings across representative operating shifts, not connected load alone.

Read detailed article
02

Q2. How do you calculate the rated current (I) and capacitance (μF) of a 3-phase capacitor bank from its kVAR rating?

Answer: For a balanced three-phase bank, I = Q × 1000 / (√3 × VLL), where Q is total kVAR and VLL is RMS line voltage. For 50 kVAR at 415 V, I ≈ 69.6 A. At 50 Hz, delta-connected branch capacitance is CΔ = Q × 1000 / (3 × 2πf × VLL²), giving approximately 308 μF per branch. For a balanced star bank, CY = Q × 1000 / (2πf × VLL²), approximately 924 μF per branch. Multiply farads by 10⁶ to obtain microfarads. These equations assume sinusoidal voltage and a plain capacitor bank without series reactors.
Practical Interview Tip: Distinguish line current, branch current and capacitance per phase when checking a nameplate.

Read detailed article
03

Q3. How do you select the voltage rating (415V vs 440V vs 480V/525V) of a capacitor for a 415V system (with and without detuned reactors)?

Answer: Without reactors, select a capacitor rated for the actual maximum continuous system voltage and harmonic duty; 440 V is a common margin on a 415 V bus, not a universal requirement. For a plain capacitor, Qactual = Qrated × (Vactual/Vrated)² at equal frequency. With a detuned reactor of fraction p = XL/XC at fundamental frequency, capacitor voltage is approximately Vbus/(1 − p) on an equivalent line-voltage basis. At 415 V, 7% gives 446 V and 14% gives 483 V before harmonic and supply margins. A matched 480 V or 525 V assembly may be suitable; confirm the manufacturer’s coordinated rating and net kVAR.
Practical Interview Tip: Never substitute a higher-voltage capacitor in a detuned bank without checking capacitance and reactor matching.

Read detailed article Schneider Electric detuned reactor guidance ↗
04

Q4. How do you select the MCCB, HRC fuse, and cable size for a capacitor feeder?

Answer: Start with nominal bank current and the manufacturer’s maximum continuous current, accounting for voltage, harmonics and capacitance tolerance. A preliminary design allowance of 1.5 × nominal current is commonly used for feeder sizing. For 50 kVAR at 415 V, nominal current is 69.6 A; the indicative allowance is 104.4 A. A 125 A breaker frame may be considered, but its trip settings, derating and fault-breaking capacity require verification. Choose coordinated HRC fuses from capacitor-duty tables and ensure cable ampacity after installation derating is adequate. Check short-circuit withstand, terminal ratings and inrush coordination under IEC 60947-2, IEC 60269 and IEC 60364-5-52.
Practical Interview Tip: Do not assign a cable cross-section or fuse rating from kVAR alone; use actual installation and coordination data.

Read detailed article Schneider Electric capacitor feeder design guidance ↗
05

Q5. How do you select the size of the smallest step and total number of steps in an APFC panel?

Answer: Log the minimum, maximum and typical reactive demand at the incomer. Select the smallest effective kVAR step to match small load changes without creating a leading power factor or excessive switching. For a 110 kVAR requirement, a seven-stage example is 5 + 5 + 10 + 10 + 20 + 20 + 40 kVAR. Its total is 110 kVAR, with 5 kVAR resolution when the controller supports those combinations. Confirm output count, switching algorithm, minimum load and duty cycle. Equal stages promote rotation; unequal stages provide more combinations. Allow for future demand only where load data supports it.
Practical Interview Tip: Check light-load behavior as well as peak compensation; oversized first steps cause hunting or overcorrection.

Read detailed article
06

Q6. How do you select the CT ratio for an APFC relay, and how do you verify P1/P2 and S1/S2 polarity?

Answer: Select a metering CT primary rating covering the maximum expected incomer current and a secondary rating matching the controller, typically 1 A or 5 A. For a 350 A maximum load, a 400/5 A CT is a possible choice, subject to accuracy, burden and overload checks. The CT must sense the combined load and capacitor-bank current upstream of both branches. Normally P1 faces the source and P2 the load; S1 and S2 follow the controller’s wiring diagram and selected voltage phase. Confirm polarity with an approved test and check measured kW direction and lagging PF against a reference instrument.
Practical Interview Tip: Never open an energized CT secondary; use an approved shorting terminal and qualified isolation procedures.

Read detailed article
07

Q7. What is the C/K value (sensitivity) in an APFC relay, and how do you calculate and set it?

Answer: C/K relates the smallest capacitor step to the current seen at the controller secondary. Let K = CT primary rating / CT secondary rating and Istep = Qstep × 1000 / (√3 × VLL). For a 10 kVAR step at 415 V and a 400/5 A CT, K = 80 and Istep ≈ 13.91 A. The secondary step current is Istep/K ≈ 0.174 A. Some controllers use this value, while ABB RVT uses approximately 0.67 × Istep/K, giving 0.116 A in this example. Enter the actual controller-specific definition or perform its approved automatic learning routine.
Practical Interview Tip: Verify that the relay’s programmed CT ratio, step capacity and displayed sensitivity agree with its manual.

Read detailed article ABB RVT controller manual ↗
08

Q8. Why is a reconnection delay time (30–60 seconds) programmed in an APFC controller?

Answer: A reconnection timer prevents a recently disconnected capacitor from being switched back while significant residual voltage remains. Reclosing against a different supply voltage phase can produce severe transient current and stress the capacitor and switching gear. A 30–60 second delay is common only where the manufacturer’s discharge arrangement permits it. IEC 60831-1 specifies a discharge-device requirement of 75 V or less within three minutes from the peak of rated voltage for applicable LV capacitors; this is not a safe-touch threshold or automatic permission to reconnect. Follow the capacitor and controller specifications for residual voltage, minimum off-time and restart after supply failure.
Practical Interview Tip: Never shorten the programmed off-time to cure slow PF response; check the switching technology and discharge design.

Read detailed article IEC 60831-1 ↗
09

Q9. What pre-commissioning checks are required before charging a new APFC panel?

Answer: Only authorized personnel should commission the panel under an approved risk assessment, isolation procedure and electrical safety permit. Verify the single-line diagram, ratings, earthing continuity, cable termination torque, ventilation, capacitor and reactor condition, fuse and breaker coordination, discharge devices and CT shorting arrangements. Follow manufacturer instructions for insulation testing; isolate capacitors and sensitive electronics where required. Check the controller settings, voltage sensing, emergency isolation and generator interlocks. Record supply voltage, frequency, load profile and harmonics before energization. IEC 61921 addresses LV correction banks; IEC 61439-1/-2 covers applicable assemblies, and IS 13340 Part 1:2024 adopts IEC 60831-1:2014 for self-healing LV capacitors.
Practical Interview Tip: Use a signed checklist and prove absence of voltage, including residual capacitor voltage, before touching internal parts.

Read detailed article IEC 61921 ↗
10

Q10. How do you operate an APFC panel in Manual vs. Auto mode, and how do you verify each step’s kVAR output?

Answer: Manual mode permits controlled stage selection for authorized commissioning; Auto mode lets the controller select stages to maintain its target PF. With the panel closed and approved test conditions established, compare the metered reactive power before and after each permitted stage operation at a stable load. For a plain balanced bank, approximate kVAR = √3 × VLL × I / 1000 using its reactive branch line current; a power analyzer is preferable where harmonics or reactors are present. Check phase current balance and compare measured output with voltage-adjusted or manufacturer-specified net step output. Confirm automatic response and alarms without bypassing interlocks.
Practical Interview Tip: Record step number, voltage, phase currents, measured kVAR and PF; stop if abnormal heating or imbalance appears.

Read detailed article
11

Q11. How do you coordinate APFC panel operation with a Diesel Generator (DG Set) changeover?

Answer: A utility-side APFC bank should normally be inhibited before transfer to a standby DG supply and remain disconnected while the DG runs, unless the generator manufacturer has approved a dedicated compensation scheme. Leading reactive power can cause generator voltage instability, self-excitation or operation outside its capability curve. Use the engineered ATS/AMF interlock and controller inhibit arrangement to prevent unintended capacitor energization. Verify the interlock during a controlled transfer test, including loss of mains and return to utility. After utility restoration, allow the prescribed stabilization and discharge interval before automatic correction resumes. Do not assume utility PF settings are suitable for generator operation.
Practical Interview Tip: Check generator capability and interlock drawings; never bypass the DG inhibit to achieve a higher displayed PF.

Read detailed article Schneider Electric generator interlock guidance ↗
12

Q12. How do you measure harmonics (THDi and THDv) and True Power Factor using a Power Quality Analyzer?

Answer: Use a correctly rated power quality analyzer at the point of common coupling or relevant feeder, following its connection diagram and electrical safety procedure. Verify network configuration, voltage phase mapping, current probe orientation and ratio. THDi = 100 × √(Σ Ih²)/I1 and THDv = 100 × √(Σ Vh²)/V1, summing harmonic orders h ≥ 2 within the measurement bandwidth. True PF = total active power / total apparent power; displacement PF describes the fundamental phase relationship. Record both before and after compensation over representative loads. IEC 61000-4-7 and IEC 61000-4-30 guide harmonic and power-quality measurement; evaluate applicable limits at the correct location.
Practical Interview Tip: Do not judge harmonic compliance from THDi alone; check individual harmonics, voltage distortion and applicable demand-based limits.

Read detailed article Fluke power quality analyzer specifications ↗
13

Q13. How do you calculate financial savings and the payback period (ROI) of an APFC installation?

Answer: Compare actual tariff components before and after correction using representative monthly data. At constant 200 kW load, improving PF from 0.80 to 0.98 reduces apparent demand from 250 to about 204.1 kVA. If that reduction applies to billed peak demand at ₹300/kVA per month, gross savings are approximately ₹13,776 per month. For a ₹180,000 installation and ₹1,000 monthly operating allowance, net savings are about ₹12,776 per month; simple payback is 180,000/12,776 ≈ 14.1 months. Annual simple ROI = annual net savings / investment × 100 ≈ 85%. Include kVAh or PF penalties only if the tariff actually applies them.
Practical Interview Tip: Use the utility’s billing formula, coincident peak demand and measured losses; capacitor correction does not guarantee process kWh savings.

Read detailed article

Test Your Knowledge Through Mock Test

Capacitor Bank Sizing & APFC Commissioning · Two tests, 10 questions each. Choose a test below to begin.

Question 1 of 100 / 10 answered

Your answers stay on this page.

KEEP LEARNING WITH ELECTRICAL TOPIC

Learn Faster. Improve Your Electrical Skills.

WEBSITE • EMAIL UPDATES

New guides. Straight to your inbox.

Subscribe free. Get fresh website updates.

Have a question? Email info@electricaltopic.com

Videos in Hindi

Electrical Topic on YouTube

Watch practical electrical lessons from our YouTube channel.

Visit channel